WONLY
    Commercial Steel Security Doors for Building Projects
    Commercial Door Systems

    Commercial Steel Security Doors for Building Projects

    Turn the building risk strategy into coordinated steel doorsets, hardware, access control, fire and egress requirements for every opening.

    For developers, architects, contractors, consultants, distributors and facility teams
    Buyer Brief

    Specify the Opening, Not a Generic Steel Door

    Commercial entrances, service routes, plant rooms, offices and secure back-of-house openings face different traffic, attack, fire and egress conditions. One generic door construction cannot answer every location.

    WONLY helps project teams coordinate the steel leaf and frame, security performance, hardware, fire or smoke duties, access control, finish, installation and handover around an opening-by-opening schedule.

    Specification Checklist

    What Buyers Should Define Before Quotation

    Opening schedule

    Identify every opening, room relationship, finished size, handing, wall construction and exposure.

    Security performance

    Define the threat, delay objective, locking points and evidence required for each risk zone.

    Fire and egress

    Record rating, smoke control, swing, closer, latch, exit hardware and authority requirements separately.

    Hardware and access

    Coordinate hinges, locks, closers, panic devices, readers, contacts, wiring and failure behaviour.

    Traffic and environment

    Match cycle duty, impact exposure, corrosion protection and finish to operation and maintenance.

    Installation and handover

    Define anchors, tolerances, perimeter interfaces, inspection records, labels, spares and maintenance files.

    Project Workflow

    From Requirement to Delivery

    01

    Issue the door schedule, risk zones, performance criteria, hardware set and access-control matrix.

    02

    Review the complete doorset, evidence boundary, drawings, samples and interface responsibilities.

    03

    Approve a reference opening, finish, hardware operation, inspection plan and change-control process.

    04

    Release production by batch, inspect installation and deliver the coordinated handover record.

    Evidence Before Award

    What a Project Buyer Should Verify

    Opening-by-opening compliance matrix

    Map security, fire, smoke, egress, accessibility and acoustic duties to each door mark.

    Configuration-specific evidence

    Match the leaf, frame, anchors, hardware, glazing, size and wall interface to applicable reports.

    Hardware and controls matrix

    Document normal use, fire alarm, power loss, network failure, override and emergency-release behaviour.

    Inspection and handover pack

    Retain approved drawings, samples, production checks, installation records, labels, manuals and maintenance intervals.

    FAQ

    Procurement Questions

    Are commercial steel security doors automatically fire-rated?

    No. Forced-entry, fire, smoke and egress are separate requirements. Where several apply, evidence must cover the proposed complete assembly.

    Can access control and panic hardware be combined?

    Often yes, but the operating logic, free egress, fire-alarm response, power-loss state and approved hardware configuration must be coordinated.

    What should be included in a commercial door RFQ?

    Provide the opening schedule, wall types, ratings, hardware sets, access-control matrix, finishes, quantities, delivery batches, destination and required documentation.

    Get Solutions & Quote

    Discuss Your Door or Smart-Entry Requirement

    Send the market, project type, quantity, opening schedule and target delivery date. Our team will identify the next technical inputs.